Construction Update – August 2023

Construction Update – August 2023

MILESTONES Connected the dewatering system to the existing storm water Sprayed the capping beam Poured the top down slab which will open up access to the site Detailed the east wall and commence shotcrete prep Silt tank and pumps onsite Remove the entire hoarding and...
Construction Update – July 2023

Construction Update – July 2023

MILESTONES Install bollards and screens to High St Work/loading zone Completed B1 ground anchors Continued to modify the dewatering system in search of optimum flow Measure first waler steels and bolt locations Installed new North boundary paling fence B1 shotcrete...
Construction Update – June 2023

Construction Update – June 2023

MILESTONES Connected the dewatering system to the existing storm water Sprayed the capping beam Poured the top down slab which will open up access to the site Detailed the east wall and commence shotcrete prep Silt tank and pumps onsite...