MILESTONES
- Connected the dewatering system to the existing storm water
- Sprayed the capping beam
- Poured the top down slab which will open up access to the site
- Detailed the east wall and commence shotcrete prep
- Silt tank and pumps onsite
- Remove the entire hoarding and rebuild to fit the 130T crane in the front yard (in the rain)