CONSTRUCTION COMMENCED

Limited Apartments Remaining

Construction
Commenced
Limited
Apartments
Available

MILESTONES

  • Connected the dewatering system to the existing storm water
  • Sprayed the capping beam
  • Poured the top down slab which will open up access to the site
  • Detailed the east wall and commence shotcrete prep
  • Silt tank and pumps onsite

GALLERY